LAGOON SWIMMING POOL, PRAGUE 9

Customer
Chapman Taylor Partners, London
Architect
Michael Pretty Architects
Main building designer
OBERMEYER HELIKA a.s.
Construction period
1998 – 2000
Activities undertaken

pre-design and design documentation, building author inspection

Construction cost
CZK 130 million

The swimming hall with the complementary programme includes: main swimming pool 25 x 13 m (6 lanes) with massage base grids, massage wall nozzles and water jets. There is also a pool for children with these water attractions: spiral water chute, rapids, happy pool with fountains and streaming water, paddling pool and whirlpool, and massage bath. There is a fitness centre (a conditioning gym and an aerobic room, physio- and therapeutic centre, sauna for 8 persons, steam chamber for 6 – 7 persons, salt bath and 2 solariums). Wet and dry cafés and an outdoor sun terrace are available for visitors. The building is also equipped with the necessary facilities for visitors, staff and technology. Access between floors is provided by a lift for 8 persons, enabling disabled people to be carried as well. The interior of the building is designed from materials that are resistant to the moisture and the effects of chlorine, and that are durable and easy to clean.

Hide
Detail informations Next Previous Close

Always with us

I would like to subscribe to the newsletter

Would you like to have an overview of real estate development, architecture and the latest trends in the construction industry?

Keep informed! Subscribe to Obermeyer Journal and other news so you won't miss any information on innovations, use of technology or interesting case studies from some of our unique projects.